Our Work
Real Projects, Real Results — See What We Deliver
Every project below is real work completed for real customers across Cardiff and South Wales. From full house rewires to EV charger installations, we document the scope, the challenge, and the result — so you can see exactly what to expect when you hire us. Read our customer reviews for more feedback.
Full Rewire — 3-Bed Victorian Terrace, Pontcanna
House RewireScope
Complete rewire including new consumer unit, 12 circuits, filled chases throughout, and EV charger preparation.
Challenge
Original 1920s rubber-sheathed wiring with lead earth. Ornate coving and ceiling roses required careful cable routing to preserve period features.
Result
Completed in 6 working days. All chases filled and sanded. Full EICR certificate issued. System designed to support future EV charger and home office circuits.
Consumer Unit Upgrade — Semi-Detached, Whitchurch
Consumer UnitScope
Replace 1980s rewirable fuse board with 18-way dual RCD consumer unit. Full circuit testing and labelling.
Challenge
Original board had no RCD protection. Two circuits showed signs of insulation deterioration. Homeowner reported regular tripping when using kitchen appliances.
Result
New Hager consumer unit fitted in 4 hours. Faulty circuits identified and repaired. Full test results recorded with EICR certificate issued same day.
EV Charger Installation — Detached, Cyncoed
EV ChargerScope
Myenergi Zappi 7kW charger installation with dedicated 32A circuit from consumer unit to driveway-mounted unit.
Challenge
Consumer unit was full — required additional ways. Cable route from internal board to external charger needed 15m SWA cable through cavity wall and underground duct.
Result
Charger installed and operational in one day. Consumer unit upgraded to accommodate new circuit. All trenching backfilled and patio slabs relaid. Full OZEV certification provided.
EICR & Remediation — 6-Bed HMO, Newport
EICRScope
Full EICR inspection of 6-bedroom HMO. Remediation of all C2 (potentially dangerous) and C3 (improvement recommended) findings.
Challenge
Property had not been inspected for 8 years. Multiple tenant modifications and non-compliant additions discovered including daisy-chained extension leads used as permanent wiring.
Result
Initial inspection completed in 3 hours. 4 x C2 and 7 x C3 findings identified. All remediation completed within 2 days. Satisfactory EICR certificate issued.
Full Rewire — 4-Bed Edwardian Villa, Penarth
House RewireScope
Complete rewire of large Edwardian property including basement, 3 floors, and garden outbuilding. 18 circuits, smart lighting preparation, and whole-home data cabling.
Challenge
4-metre ceilings on ground floor required specialist access. Original gas pipe earthing needed replacement. Ornamental plasterwork on staircase required extreme care during cable routing.
Result
Completed in 9 working days. All chases filled and matched to existing plaster. Data points installed in every room. System supports future smart home integration.
Emergency Repair — Power Loss, Barry
EmergencyScope
Emergency callout for complete power loss to ground floor. Diagnosis and repair of faulted circuit.
Challenge
Called at 8pm on a Saturday. Customer had young children and no heating or lighting on the ground floor. Required rapid diagnosis in limited light conditions.
Result
Arrived within 35 minutes. Diagnosed failed RCD caused by water ingress to an outdoor socket. Replaced RCD, sealed outdoor socket with IP66 enclosure. Power restored within 90 minutes of call.
Want Results Like These?
Get a free quote and see why 40+ customers have given us a 5-star rating. Same standards, same guarantee, every job.